T D Everything
Bank Details:
T D Everything Ltd
Sort Code: 040605
Account No.: 25715834
tdeverythinguk@gmail.com
http://www.tdeverythinggroup.com
James
Invoice Number INV-000280
Invoice Date 21/07/2026
Due Date 20/08/2026
Total Due £2,495.00

To

Service Qty Rate Adjust (%) Total
Paint Service
INVOICE T D Everything Limited Invoice To: Beechwood Perridge Close Exeter EX2 9PX Invoice Date: 20 July 2026 Invoice No: TD-2026-0720-01 Description of Works Painting and decorating works to the agreed areas of the property, including: Preparation of all surfaces, including filling, sanding and making good where required. Protection of floors, fixtures and furnishings. Mist coating and painting all newly skimmed ceilings (1 mist coat and 2 full coats). Painting hallway walls (white). Painting kitchen walls (white). Painting living room walls (white). Painting porch walls (white). Painting office walls (white) with one feature colour wall (feature colour paint supplied by the customer). Painting one bedroom (smallest bedroom) with colour to all four walls (colour paint supplied by the customer). Painting one bedroom with colour to three walls and wallpaper to one feature wall (colour paint and wallpaper supplied by the customer). Painting the remaining bedroom (white). Cutting in around ceilings, sockets, switches, skirting boards and door frames where applicable. Final clean down and removal of decorating waste. Customer Supplied Items The customer will supply: All feature colour paints. Wallpaper for the feature wall. This quotation includes trade-quality white paint only. Any additional coloured paints or wallpaper must be supplied by the customer. Price Breakdown Description Amount Labour (12 working days @ £180 per day) £2,160.00 Trade white paint, fillers, caulk, masking materials & decorating consumables £185.00 Travel, fuel & waste disposal £150.00 Total Due: £2,495.00 Payment Schedule Stage 1 – Booking Deposit (25%) – £623.75 Stage 2 – On Commencement of Works (25%) – £623.75 Stage 3 – Midway Through Works (25%) – £623.75 Stage 4 – On Completion of Works (25%) – £623.75
1 £2,495.00 £2,495.00
Sub Total:£2,495.00
Total:£2,495.00