Real project · Exmouth

Garden Patio Transformation

A full garden patio build, shown in the order the work happened — from the original clearance and dig-out through to the new paving, stepped access and final finished space.

01Clearance & excavation
02Ground preparation
03Paving & steps
04Completed patio
Garden area before the patio build in Exmouth
1. Original garden area
Excavation underway for the Exmouth garden patio
2. Clearance and excavation
Garden dig-out for new patio base in Exmouth
3. Dig-out and levelling
Ground preparation for the new Exmouth patio
4. Ground prepared for paving
Patio paving and step construction in Exmouth
5. Paving and steps taking shape
New paving and stepped access nearing completion in Exmouth
6. Paving and access completed
Finished garden patio and steps in Exmouth
7. Finished patio — wide view
Finished paved patio detail in Exmouth
8. Finished patio — paving detail
Completed Exmouth garden patio transformation
9. Finished patio — final view

What we delivered: clearance and excavation, ground preparation, a new paved patio, defined edges and stepped access — turning an uneven garden area into a practical outdoor space.

Real project · Higgins

Loft Conversion & Full Interior Renovation

A complete internal transformation, shown through the actual build. The work moved from opening up the original loft and forming the layout, through timber framing, insulation, boarding, bathroom work and a new fitted kitchen.

01Strip-out & structure
02Framing & layout
03Insulation & boarding
04Bathroom & kitchen
05Finished interiors
Original loft stripped back to the structure
1. Original loft stripped back to the structure
Timber studwork forming the new layout
2. Timber studwork forming the new layout
New partitions and room layout underway
3. New partitions and room layout underway
Internal framing and first-fix preparation
4. Internal framing and first-fix preparation
Roof structure prepared for the conversion
5. Roof structure prepared for the conversion
Plasterboard installation begins
6. Plasterboard installation begins
Insulation and boarding around the new rooms
7. Insulation and boarding around the new rooms
Tiled shower area completed
8. Tiled shower area completed
Bathroom shower preparation
9. Bathroom shower preparation
Kitchen installation underway
10. Kitchen installation underway
New room prepared for the final finish
11. New room prepared for the final finish
Finished fitted kitchen
12. Finished fitted kitchen
Completed kitchen and flooring
13. Completed kitchen and flooring
Completed shower enclosure
14. Completed shower enclosure
Completed bathroom
15. Completed bathroom
Finished kitchen — final view
16. Finished kitchen — final view
What we delivered: loft conversion works, internal timber partitions, insulation and plasterboarding, bathroom shower and sanitaryware installation, fitted kitchen installation, flooring and finished internal spaces.
\n

Real project · Bathroom renovation

Complete Bathroom Build

A full bathroom renovation shown in the real order of the work: drainage and plumbing, structural preparation, boarding and plastering, tiling, fitting the suite and final finishing.

01Drainage & plumbing
02Structure & preparation
03Plastering & tiling
04Fitted bathroom
Original drainage and plumbing work
1. Original drainage and plumbing work
New waste pipe connection installed
2. New waste pipe connection installed
Ceiling and structural preparation
3. Ceiling and structural preparation
Floor and room base prepared
4. Floor and room base prepared
Bathroom space opened and prepared
5. Bathroom space opened and prepared
Ceiling and wall preparation underway
6. Ceiling and wall preparation underway
New internal room formed and plastered
7. New internal room formed and plastered
Fresh plaster finish before tiling
8. Fresh plaster finish before tiling
Bathroom lined out ready for finishes
9. Bathroom lined out ready for finishes
Wall tiling installation underway
10. Wall tiling installation underway
Tiled bathroom walls taking shape
11. Tiled bathroom walls taking shape
Bathroom tiling and finish work
12. Bathroom tiling and finish work
Vanity unit installation underway
13. Vanity unit installation underway
Fitted vanity unit and tiled walls
14. Fitted vanity unit and tiled walls
Finished bathroom with vanity and WC
15. Finished bathroom with vanity and WC
Completed bathroom final view
16. Completed bathroom final view
What we delivered: drainage and plumbing work, structural preparation, plastering and lining, full wall tiling, sanitaryware and vanity installation, and a completed bathroom ready for use.

Real project · Dining room alteration

Dining Room Alteration & Fireplace Opening

A structural dining-room alteration captured through the build: preparation around the French-door opening, opening up the original fireplace, masonry work and the final shaped fireplace finish.

01Opening preparation
02Fireplace & masonry work
03Final shaping & finish
Original dining room condition
1. Original dining room condition
French-door opening prepared
2. French-door opening prepared
Door opening and surrounding brickwork
3. Door opening and surrounding brickwork
New sill and opening support installed
4. New sill and opening support installed
Internal access and opening work
5. Internal access and opening work
Original fireplace opened up
6. Original fireplace opened up
Fireplace brickwork exposed
7. Fireplace brickwork exposed
Fireplace opening and surrounding structure
8. Fireplace opening and surrounding structure
Existing fireplace detail during strip-out
9. Existing fireplace detail during strip-out
New fireplace opening shaped
10. New fireplace opening shaped
Opening prepared for final finish
11. Opening prepared for final finish
Fireplace surround and finish work
12. Fireplace surround and finish work
Completed shaped fireplace opening
13. Completed shaped fireplace opening
Final fireplace finish detail
14. Final fireplace finish detail
What we delivered: preparation and opening work to the dining-room external opening, careful fireplace opening and brickwork work, plus the final shaped surround ready for the next stage of the room finish.

Real project · External transformation

Full External Transformation

A complete external build shown in the order the work happened: groundwork and excavation, drainage, retaining walls and landscaping, followed by new paving, brick steps and timber handrails.

01Groundwork & excavation
02Drainage & retaining walls
03Paving & landscaping
04Steps & handrails
Original external area before the transformation
1. Original external area before the transformation
Existing rear elevation and access
2. Existing rear elevation and access
Original stepped access
3. Original stepped access
Original garden route and lawn
4. Original garden route and lawn
Rear boundary prepared for the build
5. Rear boundary prepared for the build
Excavation beside the existing access
6. Excavation beside the existing access
Retaining wall trench and timber structure
7. Retaining wall trench and timber structure
Retaining wall foundation preparation
8. Retaining wall foundation preparation
New retaining wall taking shape
9. New retaining wall taking shape
Garden edging and landscape preparation
10. Garden edging and landscape preparation
Drainage excavation underway
11. Drainage excavation underway
New underground drainage connection
12. New underground drainage connection
Drainage run installed alongside the wall
13. Drainage run installed alongside the wall
Completed lawn edge and border
14. Completed lawn edge and border
Path base prepared for paving
15. Path base prepared for paving
New access path installation
16. New access path installation
Paving and drainage channel installed
17. Paving and drainage channel installed
Paving tied into the existing steps
18. Paving tied into the existing steps
Brickwork and paving preparation
19. Brickwork and paving preparation
New brick steps under construction
20. New brick steps under construction
Completed brick steps and side wall
21. Completed brick steps and side wall
Paving and access route completed
22. Paving and access route completed
New external access and step detail
23. New external access and step detail
Timber balustrade installation
24. Timber balustrade installation
Completed steps and handrail
25. Completed steps and handrail
Finished service access detail
26. Finished service access detail
What we delivered: excavation and site preparation, new drainage runs, retaining wall construction, landscaping edges, access paving, brick steps and a timber balustrade/handrail system — creating a safer, smarter and more usable outside space.

Real project · Kitchen & hallway renovation

Kitchen & Hallway Transformation

A full internal renovation, documented from the early structural and preparation stages through to the completed fitted kitchen, stone worktops and new hallway flooring.

01Preparation & strip-out
02Structure & services
03Rebuild & fit-out
04Finished kitchen & hallway
Preparation works to the existing kitchen and hallway
1. Preparation works to the existing kitchen and hallway
Internal strip-out and access preparation
2. Internal strip-out and access preparation
Protected floor and service-route preparation
3. Protected floor and service-route preparation
New ceiling structure installed
4. New ceiling structure installed
New doorway and window area under construction
5. New doorway and window area under construction
Structural alteration and internal opening works
6. Structural alteration and internal opening works
Steel support installed for the altered layout
7. Steel support installed for the altered layout
Masonry opening and structural work completed
8. Masonry opening and structural work completed
Original kitchen area before transformation
9. Original kitchen area before transformation
New internal linings and window area under construction
10. New internal linings and window area under construction
First-fix plumbing and external service connections
11. First-fix plumbing and external service connections
Ceiling insulation and service works
12. Ceiling insulation and service works
New plumbing routes installed below floor level
13. New plumbing routes installed below floor level
New glazed internal door installed
14. New glazed internal door installed
Hallway and kitchen area prepared for the final fit-out
15. Hallway and kitchen area prepared for the final fit-out
Kitchen units and hallway finishes progressing
16. Kitchen units and hallway finishes progressing
Fitted kitchen installation underway
17. Fitted kitchen installation underway
Kitchen cabinetry and appliance layout completed
18. Kitchen cabinetry and appliance layout completed
Finished kitchen with island and fitted appliances
19. Finished kitchen with island and fitted appliances
Black stone worktop and peninsula detail
20. Black stone worktop and peninsula detail
Completed kitchen sink and stone worktop
21. Completed kitchen sink and stone worktop
Farmhouse sink and finished worktop detail
22. Farmhouse sink and finished worktop detail
Completed hallway with new flooring
23. Completed hallway with new flooring
Finished hallway floor and kitchen transition
24. Finished hallway floor and kitchen transition
What we delivered: Structural alteration, new ceiling and internal works, first-fix plumbing and services, insulation and linings, fitted kitchen installation, stone worktops and finished hallway flooring.

Real project · Drainage & patio adjustment

Garden Drainage & Patio Adjustment

A practical garden improvement project, documented from the drainage trench excavation through to the reworked patio, gravel access, lawn reinstatement and finished garden edges.

01Excavation & set-out
02Drainage installation
03Patio & access works
04Garden restoration
Original garden area before drainage and patio adjustment works
1. Original garden area before drainage and patio adjustment works
Setting out the excavation route alongside the property
2. Setting out the excavation route alongside the property
Drainage trench excavation underway
3. Drainage trench excavation underway
Installing the new drainage run
4. Installing the new drainage run
Drainage trench and pipe route formed
5. Drainage trench and pipe route formed
Sub-base preparation beside the existing patio
6. Sub-base preparation beside the existing patio
Patio slabs lifted and relaid around the doorway
7. Patio slabs lifted and relaid around the doorway
Repositioning paving to improve the garden layout
8. Repositioning paving to improve the garden layout
Adjusted patio and access route taking shape
9. Adjusted patio and access route taking shape
Patio realignment and landscaping works in progress
10. Patio realignment and landscaping works in progress
Preparing the garden for final paths and borders
11. Preparing the garden for final paths and borders
New gravel route and access area installed
12. New gravel route and access area installed
Regraded garden area ready for finishing
13. Regraded garden area ready for finishing
New gravel path and stepping-stone route
14. New gravel path and stepping-stone route
Patio adjustment and stone surround completed
15. Patio adjustment and stone surround completed
Completed patio and improved drainage area
16. Completed patio and improved drainage area
Finished paved access with gravel perimeter
17. Finished paved access with gravel perimeter
Finished garden edge, patio and lawn transition
18. Finished garden edge, patio and lawn transition
Completed patio adjustment and garden restoration
19. Completed patio adjustment and garden restoration
Final lawn and patio finish
20. Final lawn and patio finish
What we delivered: Drainage excavation and installation, patio lifting and adjustment, sub-base preparation, new gravel access routes, edging work and lawn reinstatement.

Real project · Rear garden transformation

Full Rear Garden Transformation

A complete rear-garden transformation, taking the space from a basic lawn and tired edges to a landscaped garden with defined borders, improved patio areas, gravel detailing, a feature circle and stepping-stone route.

01Set-out & preparation
02Edging & raised borders
03Patio & feature works
04Paths, gravel & finish
Original rear garden before the landscaping works
1. Original rear garden before the landscaping works
Existing lawn and perimeter before new edging
2. Existing lawn and perimeter before new edging
Materials prepared for the garden transformation
3. Materials prepared for the garden transformation
Initial strip-out and bed preparation
4. Initial strip-out and bed preparation
Setting out the new garden layout
5. Setting out the new garden layout
String-line preparation for straight edging and borders
6. String-line preparation for straight edging and borders
New timber edging and raised border construction
7. New timber edging and raised border construction
Border framing installed along the garden perimeter
8. Border framing installed along the garden perimeter
Long garden bed and timber edging taking shape
9. Long garden bed and timber edging taking shape
Completed timber-edged planter line
10. Completed timber-edged planter line
Curved raised planting feature formed
11. Curved raised planting feature formed
Garden lawn and border areas prepared for the next stage
12. Garden lawn and border areas prepared for the next stage
Patio area renewed and cleaned
13. Patio area renewed and cleaned
Patio and lawn transition completed
14. Patio and lawn transition completed
Preparing the rear feature area and stepping-stone route
15. Preparing the rear feature area and stepping-stone route
Circular paved feature pad installed
16. Circular paved feature pad installed
Rear patio detail and access area prepared
17. Rear patio detail and access area prepared
Stepping-stone path laid across the lawn
18. Stepping-stone path laid across the lawn
Rear garden landscaping in progress
19. Rear garden landscaping in progress
Circular feature patio completed
20. Circular feature patio completed
New gravel area and lattice screen installed
21. New gravel area and lattice screen installed
Stepping-stone route and gravel feature finished
22. Stepping-stone route and gravel feature finished
Finished circular patio feature with gravel surround
23. Finished circular patio feature with gravel surround
Completed gravel path and landscaping detail
24. Completed gravel path and landscaping detail
Finished lawn, patio and stepping-stone route
25. Finished lawn, patio and stepping-stone route
Completed rear garden transformation
26. Completed rear garden transformation
What we delivered: Garden preparation, timber edging and raised borders, patio improvements, a circular paving feature, gravel sections, stepping-stone access, lawn shaping and final landscape detailing.

Real project · Full garden transformation

Complete Garden Transformation

A substantial hard-landscaping project that rebuilt the garden from the ground up—new retaining and raised structures, regraded levels, feature areas, decking, gravel paths, lawn and integrated garden lighting.

01Strip-out & excavation
02Walls & new levels
03Landscaping & surfacing
04Lighting & final finish
Original rear garden before the transformation
1. Original rear garden before the transformation
Existing lawn, planting and patio levels before works
2. Existing lawn, planting and patio levels before works
Original steps and retaining features to be rebuilt
3. Original steps and retaining features to be rebuilt
Initial excavation and new garden layout set-out
4. Initial excavation and new garden layout set-out
Masonry materials prepared for new structural works
5. Masonry materials prepared for new structural works
New brick retaining wall under construction
6. New brick retaining wall under construction
Curved wall and raised border construction
7. Curved wall and raised border construction
New boundary and raised planting structure taking shape
8. New boundary and raised planting structure taking shape
Existing garden stripped back for the main build
9. Existing garden stripped back for the main build
New wall and raised edge construction in progress
10. New wall and raised edge construction in progress
Boundary structure and levels being established
11. Boundary structure and levels being established
Lawn and excavation works around the new garden layout
12. Lawn and excavation works around the new garden layout
Ground preparation for the hard landscaping stages
13. Ground preparation for the hard landscaping stages
Full garden excavation and regrading underway
14. Full garden excavation and regrading underway
Curved feature wall and lower-level works
15. Curved feature wall and lower-level works
Building the circular and curved garden feature
16. Building the circular and curved garden feature
Drainage and edging preparation alongside the patio
17. Drainage and edging preparation alongside the patio
New retaining wall and planting area construction
18. New retaining wall and planting area construction
Garden area excavated and prepared for new levels
19. Garden area excavated and prepared for new levels
Ground preparation and shaping for the new landscape
20. Ground preparation and shaping for the new landscape
Full rear garden levelled for hard landscaping
21. Full rear garden levelled for hard landscaping
Natural stone and feature planting area taking shape
22. Natural stone and feature planting area taking shape
Excavated planting and gravel zones
23. Excavated planting and gravel zones
Final preparation before finishing materials
24. Final preparation before finishing materials
Newly completed lawn and border layout
25. Newly completed lawn and border layout
Curved gravel path and finished raised planter
26. Curved gravel path and finished raised planter
Finished garden bed, gravel path and lawn edge
27. Finished garden bed, gravel path and lawn edge
Feature planting and stone detailing completed
28. Feature planting and stone detailing completed
Completed composite decking area
29. Completed composite decking area
New lawn, gravel paths and raised borders
30. New lawn, gravel paths and raised borders
Finished steps and garden lighting route
31. Finished steps and garden lighting route
Completed curved lawn and gravel perimeter
32. Completed curved lawn and gravel perimeter
Decked terrace and landscaped lawn
33. Decked terrace and landscaped lawn
Finished garden lighting and raised bed detail
34. Finished garden lighting and raised bed detail
Completed garden at dusk
35. Completed garden at dusk
Evening view of the finished garden transformation
36. Evening view of the finished garden transformation
What we delivered: Excavation and regrading, retaining and raised walls, drainage and edging, new lawn areas, gravel paths, feature planting zones, composite decking, patio works and integrated garden lighting.

Real project · Bathroom renewal

Ed Bathroom Renewal

A full bathroom rebuild shown in the actual order of the job—from opening the floor and removing the old structure, through new framing, shower preparation and wall tiling, to the fitted shower room and final finish.

01Strip-out & floor works
02Framing & first fix
03Tiling & enclosure
04Bathroom fit-out
Original bathroom floor opened for the renewal
1. Original bathroom floor opened for the renewal
Existing floor structure exposed for strip-out
2. Existing floor structure exposed for strip-out
Floor opened for drainage and plumbing access
3. Floor opened for drainage and plumbing access
Subfloor and pipework access during removal
4. Subfloor and pipework access during removal
New timber wall framing installed
5. New timber wall framing installed
Timber framing forming the new bathroom layout
6. Timber framing forming the new bathroom layout
First-fix preparation around the shower area
7. First-fix preparation around the shower area
Wall preparation and services exposed
8. Wall preparation and services exposed
Walls prepared for boarding and finishes
9. Walls prepared for boarding and finishes
Shower area lined and prepared
10. Shower area lined and prepared
New shower enclosure tiling underway
11. New shower enclosure tiling underway
Shower wall tiling in progress
12. Shower wall tiling in progress
Wall tiles and shower area taking shape
13. Wall tiles and shower area taking shape
Tiled shower enclosure installed
14. Tiled shower enclosure installed
Shower area with fittings underway
15. Shower area with fittings underway
Shower enclosure and feature wall nearing completion
16. Shower enclosure and feature wall nearing completion
Shower tray and tiled walls installed
17. Shower tray and tiled walls installed
Vanity and sanitaryware installation underway
18. Vanity and sanitaryware installation underway
Finished shower enclosure and tiled walls
19. Finished shower enclosure and tiled walls
Fitted shower unit and room finishing
20. Fitted shower unit and room finishing
Completed shower room with WC and basin
21. Completed shower room with WC and basin
Completed bathroom finish
22. Completed bathroom finish
Final completed shower room view
23. Final completed shower room view
Final tiled shower and sanitaryware finish
24. Final tiled shower and sanitaryware finish
Final bathroom layout with fitted units
25. Final bathroom layout with fitted units
Final finishing details
26. Final finishing details
Completed shower room
27. Completed shower room
Completed tiled bathroom finish
28. Completed tiled bathroom finish
Completed room — final view
29. Completed room — final view
What we delivered: strip-out, floor access and preparation, timber framing, shower-area preparation, wall tiling, shower enclosure installation, sanitaryware fit-out and final bathroom finishing.